  • Copper plant on schedule and within budget to-date
  • Copper concentrate to be bulk shipped from existing port facilities
  • On-track for commissioning in mid 2013

Nevsun Resources Ltd. is pleased to advise that the Bisha Mine copper expansion project ("project") is proceeding well against schedule and budget.

The Bisha copper expansion project will expand ore processing capacity from 2.0 to 2.4 million tonnes per year and convert from gold/silver doré to copper concentrate production. Annual run-rate copper production is expected to be 180 million pounds of payable metal per year, in concentrate with significant gold and silver by-product credits. The copper plant total spend forecast remains approximately $100 million and hot commissioning is scheduled for Q2 2013.

The project is currently tracking within schedule and budget. As at the end of May, approximately 60% of the project was committed (ordered and price fixed). The remaining un-committed budget includes a relatively large $7 million in contingency.

A dedicated project page has been added to the Nevsun website and a project photo gallery is regularly updated at http://www.nevsun.com/copper-expansion.

Copper Plant Progress

With all major process critical and long lead orders placed, the current project activities include outstanding procurement, equipment delivery, completion of civil works and commencement of steel erection. Most of the major equipment, including all the copper flotation cells, has arrived at Bisha and is awaiting installation. The filter press frames, regrind mills, concentrate thickener, mill cyclones and regrind cyclones are in transit. Foundations for the cells, racking, reagents store, and workshop will soon be complete. Assembly and installation of the plant equipment is expected to commence this month.

Copper Concentrate Bulk Handling Update

After careful consideration of various bulk shipping alternatives to smelters, the Rotainer system has been chosen for delivery of concentrate into bulk shipping carriers, using the existing Massawa container port. Rotainer and Rotainer equivalent systems are proven in both the iron ore and copper concentrate industry, mainly in Australia.

Concentrate will be trucked in specially built, Rotorcon reusable intermodal containers from the Bisha Mine site to the port of Massawa, and stacked at the existing container facility. Container trucking will be contracted and no specialized prime mover (truck) or trailer equipment is required. The copper concentrate containers will be discharged into the bulk carriers using Rotainer's Lid-Lift crane equipment which rotates the container a full 360 degrees after lifting the lid.

The Rotainer system is designed with industry leading dust suppression allowing Bisha to operate out of the existing Massawa container port. The environment is a key focus for the State of Eritrea and the Rotainer system meets both the needs for copper concentrate export while setting high environmental standards for mining operations in Eritrea.

The estimated capital cost of the Rotainer system and containers is expected to be under $25 million.

Effectively this Rotainer system is in substitution for the need to develop dedicated bulk handling facilities at the port of Massawa for the Bisha concentrate. The Company will take responsibility of the cost and control for commissioning of the Rotainer system, which reduces schedule risk. Nevsun is confident that the Rotainer system will be operational for copper concentrate shipping, starting in mid-2013.

Cash on hand and from Bisha operations is more than sufficient to pay for the remaining cost of approximately $80 million for both the copper plant and the rotainer system.

Forward Looking Statements: The above contains forward-looking statements regarding progress on the copper phase budget and timeline; bulk shipping plans, and expected start-up of copper plant. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimated","potential", "possible" and similar expressions, or statements that events, conditions or results "will," "may," "could" or "should" occur or be achieved. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those described in the Management Discussion and Analysis of the Company. The Company's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Company assumes no obligation to update such forward-looking statements in the future. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

NEVSUN RESOURCES LTD.

Cliff T. Davis, President & Chief Executive Officer

Kin Communications

604 684 6730 or Toll free: 1 866 684 6730

nsu@kincommunications.com

www.nevsun.com




Leave a Reply



State of Eritrea ሃገረ ኤርትራ Hagere Ertra دولة إرتريا Dawlat Iritrīya

Anthem: Ertra, Ertra, Ertra Eritrea, Eritrea, Eritrea

Capital (and largest city) Asmara 15°20′N 38°55′E / 15.333°N 38.917°E / 15.333; 38.917

Official language(s) Tigrinya, Arabic, English Other languages Tigre, Saho, Bilen, Afar, Kunama, Nara, Hedareb,.

Ethnic groups 60% Tigrinya, 30% Tigre, 4% Afar, 3% Saho, 3% Kunama

Demonym Eritrean Government Provisional government - President Isaias Afewerki

Independence - From Italy November 1941 - From United Kingdom under UN Mandate 1951 - from Ethiopia de facto 24 May 1991 - From Ethiopia de jure 24 May 1993

Area - Total 117,600 km2 (100th) 45,405 sq mi - Water (%) 0.14%

Population - 2009 estimate 5,224,000[4] (109th) - 2008 census 5,291,370 - Density 43.1/km2 (165th) 111.7/sq mi

GDP (PPP) 2010 estimate - Total $3.625 billion[5] - Per capita $681[5] GDP (nominal) 2010 estimate - Total $2.117 billion[5] - Per capita $397[5] HDI (2007) steady 0.472 (low) (165th) Currency Nakfa (ERN)

Time zone EAT (UTC+3) - Summer (DST) not observed (UTC+3) Drives on the right ISO 3166 code ER Internet TLD .er Calling code 291 1 ,. National TV: Eritrea Television (ERI-TV)

Eritrea (play /ˌɛrɨˈtreɪ.ə/ or /ˌɛrɨˈtriːə/;[6] Ge'ez: ኤርትራ ʾErtrā, Arabic: إرتريا Iritrīyā), officially the State of Eritrea, is a country in the Horn of Africa. The capital is Asmara. It is bordered by Sudan in the west, Ethiopia in the south, and Djibouti in the southeast. The northeast and east of the country has an extensive coastline on the Red Sea, directly across from Saudi Arabia and Yemen. The Dahlak Archipelago and several of the Hanish Islands are part of Eritrea. Eritrea's size is approximately 117,600 km2 (45,406 sq mi) with an estimated population of 6 million...

Source: Wikipedia


Home | EriTV LIVE | News | Movie | CHAT | Music 1 | Comedy | Audio | Social Networking | Travel | Sports | A&E | Amharic Music | Amharic News | Amharic News 2 | Shingrwa | EEBC | Development | EDF | Hizbawi Mekete | PIA | PIA 2 | May 24th Fest | Education | Healthcare | Artist Interview | Somalia


Copyright © 2013 · EastAFRO.com · All Rights Reserved · RSS · RSS Comments · CONTACT